Special open meeting beginning at
10:00am at the Irish Beach Firehouse: 15401 Forest View Drive, for R. J. Dial
New Home Construction Phase II application.
CALL TO ORDER
Chairperson Gordon Moores called the
meeting to order at 10:07 am. Committee
members Gordon Moores, Nik Epanchin and John McGehee were present. Leon Drolet was absent.
Others present: R.J. Dial, Al Thompson, Loretta
Thompson, Pauline Zamboni and Sue Whitaker.
DIAL 3-31 (43751 Alta Mesa Rd): New Home Construction Phase II
application: Mr. Dial present the site plan and elevation
drawings. There is minimum visual impact
with no view blockage issues; the main view site is from the Zamboni property
to the North. A three bedroom septic
system is tentatively approved by the county on the west side of the property
with an alternate site available on the North side. Two colonies of the Point Arena Beaver have
been identified on the property which, due to the breeding season, restricts
the building time to the months of July 1st thru December 1st and prohibits use
of that area. Drainage follows a natural
drainage route and the plan includes a collection system for landscaping. The mid- point of the house is 27’ 6”. The garage ridgeline from slab to top is 24’ 5”
and detached from the house. Exterior of
the home is in natural colors to blend with the surroundings and will have
“dark sky” lighting and a stone veneer skirt around the foundation. Easements
for road access and the water tank are in place. There is a plan for a hedge row on the North
and South sides of the property to reduce the visual impact of the
buildings. There are existing trees that
will be kept.
Nik
made a motion that a variance request for the house of 7’6” and the garage of
5’6” be granted. The request is based
upon (a) since there is less than a 5 ft drop in ground level across the house
and that the buildable house foot print is rather small, a stepped foundation
is impractical and not required; (b) a 20ft height above the mean natural grade
would result in a longer house than proposed creating a financial hardship for
the additional foundation costs, estimated at $60,000; (c) there are no view
corridor blockage or dwelling separation issues. Motion was seconded by John and motion passed
unanimously. Nik made a motion that the
building project be accepted as presented pending receipt of 2 sets of plans
with David Paoli’s engineering stamp and submission of a landscaping design
plan. Motion seconded by John and passed
unanimously. The ADC will advise all
neighbors of this variance giving them 30 days to submit written comments.